Monday, 19 March 2012

Snetterton looming closer!


So Im getting excited about Snetterton, I've made a huge list of things to take, more than the test weekend. I've done a few things to the bike, not all good, like snap a disc bolt, still waiting for my new bolts to come through the post, managed to calm myself down and drill out the remains, took some nerve cos I couldnt make a mistake and damage the wheel rim thread. I just hope they arrive before thursday. Its not the end of the world because I just have to take the wheel with my slicks on and not have a spare front wheel.
Next job was to make a shark fin, found some 3.5 mm AL plate, cut it then heated it up a little and bent it so it could attach to a chain cover bolt hole on the swingarm and bend in under it so its about a cm from the chain and sprocket.
Lastly Ive drilled 2 22 mm holes in the airbox lid, just to try and get a little more air flow in. Advice from vfrdiscussion forum under carburation/airbox stuff. Will try it out on friday, if its too week Ive got some bungs for the holes.

changed the front sprocket from 14 to 16 teeth, left the rear at 45.

No comments:

Post a Comment